§ 11. Colonel Wheatleyasked the Minister of Works if he is aware that the contractor removing the steel scaffolding from the shore of Poole Bay is cutting off the posts at beach level, a method which, with the endless shifting of the sands, results in the exposure of stubs of metal. causing danger to bathers and fishing boats; and if he will give instructions for this method of clearance to be changed.
§ Mr. TomlinsonNew arrangements have been made to ensure the complete removal of the steel scaffolding.