§ 31. Mr. Roger Whiteasked the Secretary of State for the Environment if he will list the major public transport investment projects approved for grants since 1968; and if he will make a statement.
§ Mr. PeytonSince the inception of the infrastructure grant scheme in October, 1968, grants totalling £107 million have been approved. Of this sum about £100 million is accounted for by 11 major schemes, details of which I will, with permission, circulate in the OFFICIAL REPORT.
§ Mr. WhiteWill my right hon. Friend bear in mind that in the South-East of England, and particularly Kent, we feel that a forward project with regard to the E.E.C. is required?
§ Mr. PeytonI will bear that in mind.
§ Following is the information:
Major Projects Approved for Infrastructure Grant Since 1968 | ||
Cost of Project | Grant Authorised | |
£m | £m | |
Extension of Victoria Line from Victoria to Brixton | 23 | 17 |
Runcorn Busway | 3 | 2 |
Liverpool Terminal Loop | 12 | 9 |
Great Northern Suburban electrification and resignalling | 35 | 26 |
Fleet Line (Western Section) | 26 | 20 |
Bradford Interchange | 7 | 2 |
Redditch Busway | 4 | 1* |
Improvement of south-east approaches to B.R. London termini | 14 | 9 |
London Transport rolling stock | 12 | 9 |
Feltham area resignalling | 6 | 4 |
Bond Street Station reconstruction | 4 | 2 |
*With prospect of further grant later. |