HC Deb 07 March 1951 vol 485 c430
42. Mr. John Grimston

asked the Parliamentary Secretary to the Ministry of Civil Aviation for how long he proposes to continue to operate the existing Standard Beam Approach installation at Bovingdon; what is the estimated cost of removing it; and what would be the additional annual maintenance charge for keeping it in service.

Mr. Beswick

No date has yet been determined for the withdrawal of Standard Beam Approach from Bovingdon. It will be available there for a period sufficient to enable operators to equip their aircraft with instrument landing system airborne receivers. Its removal would cost less than £20; the estimated annual cost of its maintenance is £800.

Mr. Grimston

In view of the very high cost of installing the alternative system, will he consider trying to keep this old service, which is perfectly useful?

Mr. Beswick

Certainly not. We have been pressed from all sides of the House, and it is an international requirement that this new system should be installed.