HC Deb 28 February 1945 vol 408 c1378
56. Mr. Bossom

asked the Minister of Supply if he will give a list of the materials required in buildings which cannot be obtained without first getting a permit from one of his controlling Departments.

Sir A. Duncan

Permits from Ministry of Supply controls for materials used directly in buildings are necessary in respect of timber and building board.

Mr. Bossom

Can the Minister state how long it usually takes for his Department to grant these permits?

Sir A. Duncan

The shortest time practicable in these matters.

Mr. Bossom

Could he turn that into days or months or weeks? His Department is credited with taking a long time very often.

Forward to