HC Deb 14 February 1945 vol 408 c219
60. Mr. Astor

asked the Minister of Works what is the position regarding the production of foamed slags; whether foaming plants are being adjoined to all steel works; and what production and price are being aimed at.

Mr. Sandys

There are at present three foamed slag plants in operation together producing about 125,000 tons per annum. The provision of capacity for a further 500,000 tons a year is under consideration by various steel works. It is hoped that the price can be reduced considerably, but I am not able to quote precise figures.

Mr. Astor

In view of the desirability of saving costs of transport of this important new material, will my right hon. Friend try to ensure that foaming plants and steel works are in each important region in the country?

Mr. Sandys

This is, of course, primarily a matter for the steel works themselves, but that is our desire and intention. I must point out, however, that not all steel works are suited for this process.