§ 44. Mr. GUYasked the Minister of Transport whether he is now in a position to make a statement as to the result of the boring and sounding operations in 1096 connection with the proposed Forth road bridge?
§ Mr. HORE-BELISHAThe borings on the Macintosh Rock site have been completed, and the consulting engineers inform me that they hope to submit their report to me shortly. The borings on the Rosyth site are not likely to be completed until the middle of July.