HC Deb 19 May 1890 vol 344 cc1247-8

Return ordered—

"Showing, in regard to Ships launched since January 1883, the estimated and actual Speed and estimated and actual Horse-power:—

Ship's name.
Launched. Date.
Completed
From. Periods in Commission.
To.
Designed by. Engines and boilers.
Contractor.
Dates. Why repeated. Official Steam Trials.
Nature of casualty, &c., or of non-fulfilment of contract.
Forced. Draught. Estimated in design of Ship. Speed.
Natural.
Forced. Draught. Reported on measured mile.
Natural.
Forced. Draught. Present estimated continuous steaming
Natural.
Forced. Draught. Estimated in design of Ship. Indicated Horse-power.
Natural.
Forced. Draught. Reported on measured mile—actual.
Natural.
Forced. Draught. Present estimated continuous steaming
Natural.
Duration of steaming at contract horse-power before receipt.
Particulars. Subsequent defects of importance reported up to 1st day of January 1890 in machinery or boilers.
Cost of making goo
Date. Boiler. Renewals of tubes replaced subsequent to receipt of engines, due to defective material.
Number.
Date. Condenser
Number.
Occasions on which measured mile speed and horse-power have since been developed.

—(Lord Randolph Churchill.)

Forward to