HC Deb 07 February 1995 vol 254 cc135-6W
Mr. Booth

To ask the Secretary of State for the Environment what plans he has to maintain recent improvements in river quality in England and Wales.

Mr. Gummer

We have in hand a major programme for water quality improvement. Between 1989 and 2005 the water companies are spending an average of some £3 billion a year, much of it of benefit to water quality. The National Rivers Authority has since 1989 been able to bring a co-ordinated approach to discharge consenting and the other means it has of bringing about improvement. Other dischargers and farmers are taking steps that benefit water quality, much of it voluntary in response to codes of practice rather than regulation. The results are shown in the more than 15 per cent. net improvement in river quality that the NRA estimates took place between 1990 and 1993. These efforts will be continuing and we are going further than required by legislation, as is shown by the more than £500 million that water companies will be spending up to 2000 to bring about additional river quality improvement.

At the time of privatisation of the water industry in 1989, we provided a further mechanism for co-ordinating and prioritising improvement, in the form of statutory water quality objectives—SWQOs. Last May, the Government put in place the new classification system inter alia as the framework for SWQOs. We now intend to consult formally on proposals for a small set of SWQOs which will allow us to test the operation of the system on a pilot basis. The final details are being agreed with the NRA.

The proposals will specify the improvements to be achieved in each case and the timetable for achieving them. With the help of the NRA, I shall also identify the specific actions that will be needed, with a preliminary assessment of the likely costs and benefits. There will then be a three-month period within which any interested person or body may comment, including by offering further information on costs and benefits. I shall than decide whether and in what form to make the SWQO. In controversial cases, I may arrange for a local inquiry before reaching my decision.

The implementation procedures, and practical operation of the statutory objectives in the initial limited pilot group of catchments will be assessed before any decision is made on whether SWQOs should be introduced on a wider basis. The Government are also considering the development of proposals for economic instruments for water pollution and abstraction. Our intention on both national water regulation, including SWQOs, and economic instruments will need to take into account the way in which water legislation is developing in the European Community.