§ 25. Mr. RedwoodTo ask the Secretary of State for Transport what have been the effects of fee competition for costs of design and supervision of roads.
§ Mr. Peter BottomleyOn average there has been a 25 per cent. reduction on the standard fee rates previously applying. This should mean that we will save about 15 per cent. on the total preparation and supervision costs for projects allocated through competitive tendering.