HC Deb 19 January 1987 vol 108 c420W
Mr. Gareth Wardell

asked the Secretary of State for Wales if he has any plans to ensure that overhead lighting is installed on the M4 motorway whenever carriageway repairs are being undertaken.

Mr. Wyn Roberts

Where lengthy periods of repair work are required on the M4 motorway and where one carriageway is closed and the other in use for two-way traffic, temporary overhead lighting is required to be provided at crossover points. We have no plans to extend this requirement.