HC Deb 22 April 1985 vol 77 cc373-4W
Mr. Woodall

asked the Secretary of State for Defence (1) if he will furnish the costs, at current prices of (a) the Challenger main battle tank, fully equipped, (b) the S870 self-propelled Howitzer, (c) the 81mm mortar and (d) 8 tonne vehicles, various types;

(2) if he will furnish the costs at current prices, of (a) an airborne very high frequency radio for Air Training Corps use, (b) a high frequency radio receiver, (c) the Sidewinder air-to-air missile, (d) the helicopter-borne antitank missile, and (e) the battery of tracked Rapier;

(3) if he will furnish the costs, at current prices, of the following small arms (a) light support weapons and (b) personal weapons and of 81mm mortar round, personal weapon round, and SP70 Howitzer round ammunition, respectively;

(4) if he will furnish the costs, at current prices, of the following projects (a) Challenger main battle tank, initial order, (b) sonar, action information and fire control systems for patrol submarines, (c) Blowpipe air defence missile improvement programme (d) weapon handling and launching system for a patrol submarine, (e) the JP233 project and (f) ALARM missile programme;

(5) if he will furnish the costs, at current prices of (a) Hawk advanced trainer aircraft, (b) Nimrod aircraft, (c) Tornado F2 aircraft, (d) Tornado GR1 aircraft, (e) Chinook helicopter, (f) EH 101 helicopter, (g) Lynx helicopters, army version and (h) Puma helicopter;

(6) if he will furnish the costs, at current prices, of (a) a nuclear-powered fleet submarine, (b) a type 22 frigate, (c) a Hunt class mine counter-measures vessel, (d) a Castle class offshore patrol vessel and (e) a Sting Ray lightweight torpedo.

Mr. Lee

As the hon. Member will be aware from an answer given by my right hon. Friend the Minister of State for Defence Procurement on 10 July 1984 at column 451, commercial confidentiality considerations, including the need to avoid prejudicing contractual negotiations, limit the amount of cost information that can be disclosed. The information in the following table can, however, be supplied. All figures are at 1984–85 outturn prices.

Unit Production Cost
Challenger MBT (fully equipped) £1.5 million
Airborne VHF radio for ATC use £1,150
High frequency radio receiver £52,000
Helicopter borne anti-tank missile (TOW) £6,000
Personal weapon round (SA 80 ball round) 22 pence
Nimrod MR Mk 2 £12 million
Chinook helicopter £9 million
Lynx for the army £3 million
Puma helicopter £2.5 million
Nuclear-powered fleet submarine £200 million
Type 22 frigate £140 million
Hunt class mine countermeasure vessel £38 million
Castle class offshore patrol vessel No such vessel is on order
Total Estimated Programme Cost Challenger MBT (initial cost) Programme costs in the region of £350 million
JP 233 Of the order of £700 million
ALARM £300 million
Torando F2 and GRI £9,743 million
EH 101 £1,380 million
Hawk trainer aircraft £306 million