HC Deb 06 June 1984 vol 61 c165W
Mr. Peter Bruinvels

asked the Secretary of State for Transport when consideration will be given to allowing full access on to the M25 from the A21.

Mrs. Chalker

Full access between the M25 and A21 at Sevenoaks is already available, although there may be some temporary delays during construction of the Swanley-Sevenoaks section of the motorway. I hope to make an announcement about connections between the M26 and local roads in the Sevenoaks area shortly.