The initial cost of installing lighting throughout the remaining parts of the motorway system is approximately £90 million, including £7 million for the M25. The corresponding running costs, including maintenance, are estimated to be about £9 million per annum.

Mr. Peter Bruinvels

asked the Secretary of State for Transport how many miles of motorway have lighting installed along them, by motorway; and how many miles of motorway lighting were installed during, and how many after, construction of the motorway.

Mrs. Chalker

The following motorways have lighting:

Motorway Length with lighting (miles) Installed during construction (miles) Installed after construction (miles)
M1 68 5 63
M3 2 1 1
M4 26.3 3.8 22.5
Motorway Length with lighting (miles) Installed during construction (miles) Installed after construction (miles)
M5 36 17 19
M6 56 21 35
M11 6.2 6.2
M20 1.6 1.3 0.3
M23 2.6 2.6
M25 30 30
M27 4.8 4.8
M40 1 1
M53 11.4 10.7 0.7
M54 2 2
M55 1.3 1.3
M56 7.6 7.6
M57 0.5 0.5
M58 5 4.2 0.8
M61 3 3
M62 48 30 18
M63 13.7 8.7 5
M66 2.6 2.6
M67 2.9 2.9
M180 1.1 1.1
M621 2.2 2.2
Total 335.8 168.3 167.5