HC Deb 09 April 1968 vol 762 c207W
49. Mr. Mikardo

asked the Minister of Power when he intends to use his powers under the Iron and Steel (Pensions Schemes) Regulations, 1967 to secure the transfer of those contributions paid into the anti-trade union Foreman and Staff's Mutual Benefit Society to some suitable non-discriminatory scheme operated by the British Steel Corporation.

400 kV Double Circuit 275 kV Double Circuit 132 kV Double Circuit 66 kV Double Circuit 66 kV Single Circuit 33 kV Double Circuit 33 kV Single Circuit
£ £ £ £ £ £
Overhead Lines 65,000 39,000 18,000 13,400 4,600 to 6,500 Very little used but approx. double the costs for 33 kV 3,000 to 4,000
Underground Cables 930,000 320,000 165,000 62,600 25,400 to 32,400 single lines 21,000 to 27,000
Extra for termination costs at both ends of underground cables. 120,000 40,000 15,000 At these voltages, termination costs are not significant