HC Deb 29 July 1913 vol 56 c295W
Mr. CLANCY

asked the Secretary to the Treasury, if he will state what is the cause of the delay made by the Road Board in recommending the Grant for the improvement of the Dublin-Garristown road which they some time since indicated their intention to propose, all the conditions being then fulfilled.

Mr. MASTERMAN

The final specification for the proposed work on the Dublin-Garristown Road was received by the Road Board on the 12th instant. Immediately afterwards the Board arranged to have the road inspected on their behalf. The inspection will take place on the 31st instant, and as soon as the Report on the inspection has been received, the application for a Grant will be dealt with.