HC Deb 26 January 2004 vol 417 cc94-5W
Mr. Hoyle

To ask the Secretary of State for Trade and Industry if she will list applications for wind farm developments in Lancashire, broken down by(a) location and (b) output in kw per hour. [149967]

Mr. Timms

Proposals to construct and operate generating stations with a capacity greater than 50 megawatts (MW) require the Secretary of State's consent under section 36 of the Electricity Act 1989.

She is currently considering one application for her consent to construct a 65 MW wind farm at Scout Moor. The applicant estimates that the on site wind analysis indicates a likely capacity factor of 35 per cent. which would indicate that the proposed wind farm would generate some 197,000,000 kWh per annum.

Central Government do not hold records of proposals for on shore wind farms at or below 50MW as they fall to he determined by the local planning authority under the normal planning regime.

£million
1999—2000 2000—01 2001—02 2002—03 2003—04 2004—05 2005—06
Science Enterprise Challenge 25 5 10
University Challenge 10 10 20 5
Higher Education Innovation Fund (SOT) 20 20 40 61 70>
Higher Education Innovation Fund(DfES) 20 20> 20>
Public Sector Research Establishment 10 5 10
Total 35 10 50 30 70 86 100

There was no expenditure prior to 1999, as the first of these programmes were announced in the pre-Budget statement November 1998. The Higher Education Innovation Fund is run jointly with DfES and their contributions have been included in the table. A number of other DTI initiatives contribute to knowledge transfer, but are recorded under separate headings in DTI's annual report.