HC Deb 10 December 1992 vol 215 c744W
Mr. Alex Cathie

To ask the President of the Board of Trade what proposals he has to increase the generation of wind-generated electricity in Wales; and if he will make a statement.

Mr. Eggar

Wind-generated electricity is being implemented in Wales with support from the non-fossil fuel obligation. Two wind farms have recently become operational with an installed capacity of 14.4 MW. A further five wind farms with an installed capacity of 46.4 MW are currently under construction and expected to be delivering electricity to the grid within the next six months.

Forward to