HC Deb 25 October 1973 vol 861 cc673-4W
Mr. Spearing

asked the Secretary of State for Education and Science what changes she has required the London borough of Ealing to make in the design of Berrymede School, Acton, at what monetary saving to the authority; and what is the floor space per pupil proposed for the new school.

Mr. St. John-Stevas

The LEA was invited to make a saving in the tender submitted for approval of about £14,600 to comply with cost allowances. The Department did not stipulate how this should be done, but it is understood that the saving was found largely from work outside the building. The gross area per cost place is 34.05 sq. feet.