HL Deb 03 August 1897 vol 52 c192

Where any such sewer shall pass under or across, or in any way affect any railway or canal, or any bridge, tunnel, or other work in connection therewith, the following provisions for the protection of such railway or canal, or bridge, tunnel, or other work, shall apply and have effect:—

  1. (1.) The whole works connected with such sewer, so far as affecting any railway or canal, or bridge, tunnel, or other work, shall be executed and thereafter maintained under the superintendence and to the reasonable satisfaction of the engineer of the railway or canal company, and according to plans and specifications to be previously submitted to such engineer and approved by him in writing. Provided that if such engineer shall not have expressed his approval or disapproval of such plans and specifications within fourteen days after the same shall have been submitted to him, he shall be deemed to have approved thereof;
  2. (2.) Such works, and any alteration which it may at any time be necessary to make in such works, may be executed either by the local authority or by the railway or canal company at the option of the engineer of the railway or canal company;
  3. (3.) In the event of the local authority and the engineer of the railway or canal company differing in opinion in regard to any works affecting the railway, or canal, or bridge, tunnel, or other work, or as to the mode of carrying out such works, or otherwise in relation thereto, such difference shall, on the application of the local authority, or of the railway or canal company, be referred to an engineer to be appointed by the sheriff, and shall be decided by the sheriff upon the report of such engineer, and such decision shall be final.

Amendment made: Leave out "such" ["such sewer"].—(Lord Balfour.)

Clause 122,—