Heading: |
Unmanned Air Systems |
Question ID: |
1762242 |
UIN: |
28897 |
House: |
Commons |
Date tabled: |
2025-02-05 |
Asking Member ID: |
1444 |
Asking Member display name: |
Mr Mark Francois
|
Asking Member handle: |
|
Asking Member Twitter reference: |
Mr Mark Francois
|
Member interest: |
false |
Question text: |
To ask the Secretary of State for Defence, what factors contributed to the Protector drone system's downgrade to a red rating in the IPA Annual Report 2023-24; what steps are being taken to mitigate significant cost increases and delays; and what the revi |
Is named day: |
true |
Date of holding answer: |
|
Date answered: |
2025-02-11 |
Date answer corrected: |
|
Is holding answer: |
false |
Is correcting answer: |
false |
Answering Member ID: |
483 |
Answering Member display name: |
Maria Eagle
|
Answering Member handle: |
meaglemp
|
Answering Member Twitter reference: |
@meaglemp
|
Correcting Member ID: |
|
Correcting Member display name: |
|
Correcting Member handle: |
|
Correcting Member Twitter reference: |
|
Answer text: |
The downgrade of Protector to a red rating was primarily driven by a delay to the approval of the Review Note, which is being considered as part of the ongoing Strategic Defence Review. There are no anticipated cost increases, and all costs captured withi... |
Original answer text: |
|
Comparable answer text: |
|
Answering body ID: |
11 |
Answering body name: |
Ministry of Defence |
Tweeted: |
true |