Heading: |
Wind Power: Expenditure |
Question ID: |
1746503 |
UIN: |
17505 |
House: |
Commons |
Date tabled: |
2024-12-03 |
Asking Member ID: |
350 |
Asking Member display name: |
Sir John Hayes
|
Asking Member handle: |
|
Asking Member Twitter reference: |
Sir John Hayes
|
Member interest: |
false |
Question text: |
To ask the Secretary of State for Energy Security and Net Zero, what the total cost to the public purse of curtailment of onshore wind turbines in England was in the last three years. |
Is named day: |
false |
Date of holding answer: |
|
Date answered: |
2024-12-10 |
Date answer corrected: |
|
Is holding answer: |
false |
Is correcting answer: |
false |
Answering Member ID: |
4998 |
Answering Member display name: |
Michael Shanks
|
Answering Member handle: |
mgshanks
|
Answering Member Twitter reference: |
@mgshanks
|
Correcting Member ID: |
|
Correcting Member display name: |
|
Correcting Member handle: |
|
Correcting Member Twitter reference: |
|
Answer text: |
The Department does not hold this information. A summary of constraint costs is publicly available at https://www.neso.energy/data-portal/constraint-breakdown, and network constraint costs for 2023 were £1.4bn. The National Energy System Operator is respo... |
Original answer text: |
|
Comparable answer text: |
|
Answering body ID: |
215 |
Answering body name: |
Department for Energy Security and Net Zero |
Tweeted: |
true |