<p>Net Zero consistent scenarios for the power sector are published as Annex O of the Energy and Emission Projections.[1] In line with National Grid targets, these scenarios are configured to ensure a minimum lost load of 3 hours in any given year.</p><p> </p><p><em>[1] <a href="https://www.gov.uk/government/publications/energy-and-emissions-projections-net-zero-strategy-baseline-partial-interim-update-december-2021" target="_blank">https://www.gov.uk/government/publications/energy-and-emissions-projections-net-zero-strategy-baseline-partial-interim-update-december-2021</a></em></p>