<p>The eastbound entry slip road at junction 4 was closed between the hours of 8 pm and 6 am from 29 to 31 October 2013, and similarly at junction 5, the westbound entry slip road was closed from 31 October to 2 November 2013, to enable carriageway resurfacing works to be carried out.</p><p>Advisory signing was deployed within the locality of junction 4 and junction 5 in the week prior to the works. The agency also issued a road works press release on 25 October 2013 and undertook a letter drop to residents.</p><p>The agency does not normally place signing on local roads for short duration closures, given the practicality of erecting multiple advisory road signs and the associated costs. However, the signage for the agreed diversion routes was also implemented during the closures.</p> |