<p>I set out the position below. It is too soon to say what any strike price might be for these projects.</p><br /><table><tbody><tr><td><p><strong>Site</strong></p></td><td><p><strong>Developer</strong></p></td><td><p><strong>Proposed generating capacity</strong></p></td><td><p><strong>Potential timescale for operation</strong></p></td></tr><tr><td><p>Wylfa</p></td><td><p>Horizon</p></td><td><p>2.7 GW</p></td><td><p>mid-2020s</p></td></tr><tr><td><p>Oldbury</p></td><td><p>Horizon</p></td><td><p>2.7 GW</p></td><td><p>to be confirmed</p></td></tr><tr><td><p>Moorside</p></td><td><p>NuGen</p></td><td><p>3.6 GW</p></td><td><p>mid-2020s</p></td></tr><tr><td><p>Sizewell</p></td><td><p>EDF/CGN</p></td><td><p>3.2 GW</p></td><td><p>to be confirmed</p></td></tr><tr><td><p>Bradwell</p></td><td><p>EDF/CGN</p></td><td><p>to be confirmed</p></td><td><p>to be confirmed</p></td></tr></tbody></table><p><br></p>