Subject | Predicate | Object |
---|---|---|
<p>As part of the Network Options Assessment (NAO) which accompanied the Holistic Network Design (HND), the Electricity System Operator (ESO) identified the need for a new network reinforcement between North and South Wales. National Grid Electricity Transmission (NGET) is responsible for delivery of the required infrastructure. NGET is currently undertaking a detailed design phase to determine the exact route.</p> | ||