<p>The UK currently has 14.7GW of operational offshore wind capacity and 7.7GW under construction. The number of turbines that will need to be installed annually to meet the ambition of up to 50GW by 2030 including up to 5GW of floating wind will depend upon the power of the turbines that projects deploy.</p>