Subject Predicate Object
ZAtJr5mr
a
Resource
Answer
Written answer
answer has question
bw0uwxqo
answer has answering person
Huw William Merriman
answer text
<p>Southeastern introduced a new timetable on 11 December 2022. Since its introduction punctuality has significantly improved on the Bexleyheath Line.</p><p> </p><p>The following table shows the industry measure of On Time (the percentage of recorded station stops where the train arrived less than one minute later than its advertised time) for each rail period since the new timetable was introduced.</p><p>Rail Period Bexleyheath Line</p><table><tbody><tr><td><p>P2310 (10 Dec – 07 Jan)</p></td><td><p>46.7%</p></td></tr><tr><td><p>P2311 (08 Jan – 04 Feb)</p></td><td><p>59.0%</p></td></tr><tr><td><p>P2312 (05 Feb – 04 Mar)</p></td><td><p>63.9%</p></td></tr><tr><td><p>P2313 (05 Mar – 31 Mar)</p></td><td><p>66.6%</p></td></tr><tr><td><p>P2401 (01 Apr – 29 Apr)</p></td><td><p>70.0%</p></td></tr></tbody></table>
answer given date
answer has answering body
Department for Transport
written answer has answering body
Department for Transport
Department for Transport
answering body has written answer
ZAtJr5mr
answering body has answer
ZAtJr5mr
bw0uwxqo
question has answer
ZAtJr5mr
Huw William Merriman
answering person has answer
ZAtJr5mr