<p>The estimated outturn cost for the Flat Roofs Work upgrades project is £45 million. The project consists of 68 individual roof upgrades.</p><p><br>Flat Roofs Work Package 1 consists of 23 individual roof upgrades within the House of Commons area, and Flat Roofs Work Package 2 consists of 45 individual roof upgrades within both House of Commons and House of Lords areas.</p><p><br>Works in scope include:</p><ul><li>Preventing water ingress through the flat roof areas and hence preventing further degradation of the building fabric and internal finishes.</li><li>Rationalising existing fire escapes and walkways and provide safe access to the roofs for maintenance purposes e.g. guttering, roof cleaning, essential Mechanical and Engineering (M&E) plant etc.</li><li>Intrusive surveys (internal / external) of all flat roofs in scope, including M&E installations.</li></ul>