. . . . . "The Highways Agency currently has no resurfacing works programmed for M181. However, the Agency will be undertaking a study of the M181 road surface; depending on the findings of this study, resurfacing on parts of this route may be carried out within the next three years. Localised repairs are expected to be undertaken sooner to ensure user safety.The strategic road network is maintained in a safe and serviceable condition on a whole life cost principle, identifying the appropriate maintenance treatment at the optimum intervention time." . "2006-01-31+00:00"^^ . . . . . . .