<p>The Renewable Energy Planning Database (REPD) tracks the progress of all projects over 0.01MW from submission of a planning application through to determination and generation:</p><p>https://restats.decc.gov.uk/app/reporting/decc/monthlyextract</p><p>As at the end of December 2013, the REPD shows:</p><p><table><thead><tr><td valign="top" /><td valign="top"> Numberof onshore wind applicationsapproved <br /></td></tr></thead><tbody><tr><td valign="top">2010<br /></td><td valign="top">116<br /></td></tr><tr><td valign="top">2011<br /></td><td valign="top">132<br /></td></tr><tr><td valign="top">2012<br /></td><td valign="top">268<br /></td></tr><tr><td valign="top">2013<br /></td><td valign="top">270<br /></td></tr></tbody><tfoot><tr><td valign="top"> Note: <br />Thistable reflects the date of successful appeals and, in all other cases,the date of determination of the initialapplication.<br /></td></tr></tfoot></table></p>