|
<p>Highways England, the Cumbria Local Enterprise Partnership, and Cumbria County Council commissioned a study to examine the connectivity, capability, resilience, and reliability of the A595. This will conclude later this month. Highways England has also commenced its evidence-based Route Strategy process. If this section of the A595 is included in the priority list, the next stage would be to consider potential improvement options, which would be developed during the next Road Investment Strategy (RIS) period (2020-2025).</p><p><strong> </strong></p> |