|
<p>DECC have not undertaken any large scale building refurbishment work in the last 24 months but has carried out smaller refurbishment projects. Primarily to redecorate after wear and tear or to increase the capacity and efficiency of the estate. These are listed below:</p><p><table><thead><tr><td valign="top">Item<br /></td><td valign="top">Cost1(£)<br /></td></tr></thead><tbody><tr><td valign="top">Creationofoffice<br /></td><td valign="top">10,278.67<br /></td></tr><tr><td valign="top">Basementdecorationworks<br /></td><td valign="top">2,778.05<br /></td></tr><tr><td valign="top">Variousshower installations to improve facilities for cyclists,etc.<br /></td><td valign="top">104,127.6<br /></td></tr><tr><td valign="top">Decorationworks<br /></td><td valign="top">10,064.04<br /></td></tr><tr><td valign="top">Carpettileinstallation<br /></td><td valign="top">3,141.43<br /></td></tr><tr><td valign="top">Decorationworks<br /></td><td valign="top">58,198.9<br /></td></tr><tr><td valign="top">Decorationworks<br /></td><td valign="top">11,913.52<br /></td></tr><tr><td valign="top">Kitchenreplacements<br /></td><td valign="top">68,806.01<br /></td></tr><tr><td valign="top">Flooringreplacements<br /></td><td valign="top">20,166.02<br /></td></tr><tr><td valign="top">Skirtinganddecoration<br /></td><td valign="top">2,446.2<br /></td></tr><tr><td valign="top">Decorationworks<br /></td><td valign="top">10,826.52<br /></td></tr><tr><td valign="top">Variousbasement plant rooms floorpainting<br /></td><td valign="top">18,479.00<br /></td></tr><tr><td valign="top">Total<br /></td><td valign="top">321,225.96<br /></td></tr></tbody><tfoot><tr><td valign="top">1IncludingVAT.<br /></td></tr></tfoot></table></p> |