answer text
<p>The estimated construction cost for the Winterbottom to Bamfurlong section of the route is £360 million. This part of the route consists of three sections:</p><p><table><thead><tr><td valign="top" /><td valign="top">£million<br /></td></tr></thead><tbody><tr><td valign="top">HSM12<br /></td><td valign="top">110<br /></td></tr><tr><td valign="top">HSM21<br /></td><td valign="top">185<br /></td></tr><tr><td valign="top">HSM22<br /></td><td valign="top">65<br /></td></tr></tbody></table></p><p>Detailed estimates of the cost of land and risk will be determined at a later stage of development.</p>
answer given date
answer has answering body
Department for Transport
written answer has answering body
Department for Transport
Department for Transport
answering body has written answer
3PTvXQk8
answering body has answer
3PTvXQk8
x8NlzVKC
question has answer
3PTvXQk8
Robert Goodwill
answering person has answer
3PTvXQk8