<p>The estimated construction cost for the Winterbottom to Bamfurlong section of the route is £360 million. This part of the route consists of three sections:</p><p><table><thead><tr><td valign="top" /><td valign="top">£million<br /></td></tr></thead><tbody><tr><td valign="top">HSM12<br /></td><td valign="top">110<br /></td></tr><tr><td valign="top">HSM21<br /></td><td valign="top">185<br /></td></tr><tr><td valign="top">HSM22<br /></td><td valign="top">65<br /></td></tr></tbody></table></p><p>Detailed estimates of the cost of land and risk will be determined at a later stage of development.</p>