§ Mr. DrewTo ask the Secretary of State for Transport what the posted speed is of each fixed speed camera within a Safety Camera Partnership. [142266]
§ Mr. JamiesonThe information is not available in the form requested. However, the speed limits at the camera sites in the six English Safety Camera Partnerships986W
Concrete sections completed in 2003–04 Cost (£ million) M11 B1038 (Newport)—All 10.9 Ml Junctions 1-2 6.9 M20 Junctions 11 a-11 7.8 M20 Junctions 13-11a — M25 J26-27 14.3 M5 Junctions 26 to 27 Contract 2 3.7 M5 J27 South to Willand 4.9 Alt Witham-Kelvedon 13.7 Sub total 78.0 M20 J11 to Sellindge and M20 Sellindge to Smeeth schemes were delivered as one project. The same applies to M20 Junctions 11a to 11 and M20 Junctions 13 to 11a schemes and the M27 Junctions 2 to 3 and M27 Junctions 3 to 4.
The Highways Agency has reported the following allocated expenditure for concrete trunk roads resurfacing with low noise materials since 1999:
£ million 1999–2000 7.5 2000–01 6 2001–02 0.7 2002–03 51.4 2003–04 76