HC Deb 20 October 2003 vol 411 c359W
Norman Baker

To ask the Secretary of State for Transport (1) what percentage of the demolition waste from the demolition of St. Christopher House, London is being sent to landfill; [133117]

(2) to what uses the waste from the demolition of St. Christopher House, London is being put; and what percentage of the total waste is being used in each way. [133118]

Mr. McNulty

The Highways Agency left St. Christopher House in September 2002 and the lease expired shortly after. The MOD remained for a few months longer, as their lease had not expired. The building was never a Crown building and it is being demolished by the private landlord. The Highways Agency now has nothing to do with the building.