§ Mr. PriskTo ask the Secretary of State for Transport what reasons underlie the differences between the projected capacity figures for the three expansion options for Stansted Airport outlined in The Future of Air Transport in the South East and SERAS report No. 51. [106503]
§ Mr. JamiesonThe terminal capacities for both the one and three additional runway options at Stansted presented in the "Future Development of Air Transport in the United Kingdom: South East" do not differ from those quoted in the SERAS report No. 51 (Stansted 811W options five and seven). Both documents quote capacities of 82 and 129 million passengers per annum (mppa) respectively.
The consultation option for two new runways at Stansted was developed as a variant in the early stages of the study and is presented in the "SERAS Stage One Appraisal Findings report (section 4.1.9)". The capacity quoted for this option in the consultation document and that report is 102 mppa. Copies of all reports are available in the House Libraries.