§ Mr. SalmondTo ask the Secretary of State for Trade and Industry what the average entry charges into the National Transmission Service were from each of the major UK gas terminals over the last year. [72557]
§ Mr. WilsonThe information for 3 major terminals is as follows:
Winter Summer Gas Year p/therm 2001–02 2002 2001–02 Bacton 0.03 0.02 0.02 St Fergus 1.19 1.30 1.25 Teesside 0.34 0.19 0.26 Source:
Transco
Notes:
(i) Volume-weighted averages of prices achieved in Transco's primary auctions for entry capacity. (ii) Winter is the period from October"March (inclusive). Summer is the period from April"September (inclusive). The Gas Year runs from 1 October to 30 September.