HC Deb 02 May 2002 vol 384 c935W
Sue Doughty

To ask the Chancellor of the Exchequer what the total cost to the Treasury will be(a) at the outset of its introduction and (b) projected in the next three years of the extension of the 5 per cent. rate of VAT to apply to the grant-funded installation of (i) factory-insulated hot water tanks, (ii) micro-combined heat and power and (iii) renewable energy heating systems in the homes of the less well-off. [53716]

Mr. Boateng

The cost of the reduced rate of VAT for these grant-funded installations at the outset of its introduction and over the next three years will be negligible.