§ Mr. JenkinTo ask the Secretary of State for Defence (1) if he will list the forecast in-service date as at 31 March(a) 1997, (b) 1998, (c) 1999, (d) 2000, (e) 2001 and (f) 2002 for the (i) Type 23 Frigate, (ii) Single-role minehunter, (iii) Sting Ray Torpedo, (iv) Sonar 2087 Type 45 Destroyer, (iv) Seawolf Block 2, (vi) C-17, (vii) Auxiliary Oiler, (viii) Vanguard Class and (ix) Trident II; [69564]
(2) if he will list the forecast cost of demonstration and manufacture phase as at 31 March (a) 1997, (b) 1998, (c) 1999, (d) 2000, (e) 2001 and (f) 2002 for the (i) Type 23 Frigate, (i) Single-role Minehunter, (iii) Sting Ray Torpedo, (iv) Sonar 2087 Type 45 Destroyer, (v) Seawolf Block 2; C-17, (vi) Auxiliary Oiler, (vii) Vanguard Class and (viii) Trident II; [69568]
(3) if he will list the (a) date of initial gate, (b) target date for main gate approval and (c) date of main gate approval for the (i) Type 23 Frigate, (ii) single-role, (iii) Minehunter, (iv) Sting Ray Torpedo, (v) Sonar 2087 Type 45 Destroyer, (vi) Seawolf Block 2, (vii) C-17, (viii) Auxiliary Oiler, (ix) Vanguard Class and (x) Trident II; [69556]
(4) if he list the (a) approved cost of assessment phase at initial gate, (b) actual cost of assessment phase, (c) approved cost of demonstration and manufacture phase at main gate and (d) approved in-service date at main gate for the (i) Type 23 Frigate, (ii) Single-role Minehunter, (iii) Sting Ray torpedo, (iv) Sonar 2087 Type 45 Destroyer, (v) Seawolf Block 2, (vi) C-17, (vii) Auxiliary Oiler, (viii) Vanguard Class and (ix) Trident II. [69560]
§ Dr. Moonie[holding answer 15 July 2002]I will write to the hon. Member and a copy of my letter will be placed in the Library of the House.
§ Mr. JenkinTo ask the Secretary of State for Defence (1) what the forecast in-service date was as at 31 March(a) 1997, (b) 1998, (c) 1999, (d) 2000, (e) 2001 and (f) 2002 for the (i) COBRA (Counter Battery Radar), (ii) Chinook MSH/HC2A, (iii) Chinook MSH/HC3, (iv) BR 90 Bridge Systems, (v) SHIELDER, (vi) Combined Arms Tactical Trainer and (vii) Medium and Light Utility truck; [69567]
(2) if he will list the forecast in-service date as at 31 March (a) 1997, (b) 1998, (c) 1999, (d) 2000, (e) 2001 and (f) 2002 for the (i) COBRA (Counter Battery Radar), (ii) Chinook MSH/HC2A, (iii) Chinook MSH/HC3, (iv) BR 90 Bridge Systems, (v) SHIELDER; Combined Arms Tactical trainer and (vi) Medium and Light Utility truck; [69563]
154W(3) if he will list the (a) date of initial gate,(b) target date for main gate approval and (c) date of main gate approval for the (i) COBRA (Counter Battery Radar), (ii) Chinook MSH/HC2A, (iii) Chinook MSH/HC3, (iv) BR 90 Bridge Systems, (v) SHIELDER, (vi) Combined Arms Tactical Trainer and (vii) Medium and Light Utility truck; [69555]
(4) if he will list the (a) approved cost of assessment phase at initial gate, (b) actual cost of assessment phase, (c) approved cost of demonstration and manufacture phase at main gate and (d) approved in-service date at main gate for the (i) COBRA (Counter Battery Radar), (ii) Chinook MSH/HC2A, (iii) Chinook MSH/HC3, (iv) BR 90 Bridge Systems, (v) SHIELDER, (vi) Combined Arms Tactical Trainer and (vii) Medium and Light Utility truck. [69559]
§ Dr. Moonie[holding answer 15 July 2002]I will write to the hon. Member and a copy of my letter will be placed in the Library of the House.
§ Mr. JenkinTo ask the Secretary of State for Defence if he will list the(a) date of initial gate, (b) target date for main gate approval and (c) approved cost of assessment phase at initial gate for the (i) future Carrier-Bourne aircraft, (ii) future Carrier, (iii) Guided Multiple Launch Rocket System, (iv) Lightweight Mobile Artillery Weapon System (Gun) and (v) Microwave Landing System. [69554]
§ Dr. Moonie[holding answer 15 July 2002]I will write to the hon. Member and a copy of my letter will be placed in the Library of the House.
§ 1998. Mr. JenkinTo ask the Secretary of State for Defence (1) if he will list the forecast in-service date as at 31 March(a) 1997, (b) 1998, (c) 1999, (d) 2000, (e) 2001 and (f) 2002 for the (i) Tornado F3-weapon system upgrade, (ii) Sea Harrier FRS I to F/A2 conversions, (iii) Next Generation Anti-Armour Weapon and (iv) Eurofighter Aircrew Synthetic Training Aids; [69565]
(2) if he will list the forecast cost of demonstration and manufacture phase as at 31 March (a) 1997, (b)(c) 1999, (d) 2000, (e) 2001 and (f) 2002 for the (i) Tornado F3-weapon system upgrade (ii) Sea Harrier FRS1 to F/A2 conversions, (iii) Next Generation Anti-Armour Weapon and (iv) Eurofighter Aircrew Synthetic Training Aids; [69569]
(3) if he will list the (a) date of initial gate, (b) target date for main gate approval and (c) date of main gate approval for the (i) Tornado F3—weapon system upgrade, (ii) Sea Harrier FRSI to F/A2 conversions, (iii) Next Generation Anti-Armour Weapon and (iv) Eurofighter Aircrew Synthetic Training Aids; [69557]
(4) if he will list the (a) approved cost of assessment phase at initial gate, (b) actual cost of assessment phase, (c) approved cost of demonstration and manufacture phase at main gate and (d) approved in-service date at main gate for the (i) Tornado F3—weapon system upgrade, (ii) Sea Harrier FRSI to F/A2 conversions, (iii) Next Generation Anti-Armour Weapon and (iv) Eurofighter Aircrew Synthetic Training Aids. [69561]
§ Dr. Moonie[holding answer 15 July 2002]: I will write to the hon. Member and a copy of my letter will be placed in the Library of the House.
155W
§ Mr. JenkinTo ask the Secretary of State for Defence (1) what the forecast in-service date was as at 31 March(a) 1997, (b) 1998, (c) 1999, (d) 2000, (e) 2001 and (f) 2002 for the (i) E3D Sentry-Radar Improvement Programme, (ii) Skynet 4 Stage 2 and (iii) Skynet 5; [69566]
(2) if he will list the forecast cost of demonstration and manufacture phase as at 31 March (a) 1997, (b) 1998, (c) 1999, (d) 2000, (e) 2001 and (f) 2002 for the (i) E3D Sentry-Radar System Improvement Programme, (ii) Skynet 4 Stage 2 and (iii) Skynet 5; [69570]
(3) if he will list the (a) date of initial gate, (b) target date for main gate approval and (c) date of main gate approval for the (i) E3D Sentry-Radar System Improvement Programme, (ii) Skynet 4 Stage 2 and (iii) Skynet 5; [69558]
(4) if he will list the (a) approved cost of assessment phase at initial gate, (b) actual cost of assessment phase, (c) approved cost of demonstration and manufacture phase at main gate and (d) approved in-service date at main gate for the (i) E3D Sentry-Radar System Improvement programme, (ii) Skynet 4 Stage 2 and (iii) Skynet 5. [69562]
§ Dr. Moonie[holding answer .15 July 2002]I will write to the hon. Member and a copy of my letter will be placed in the Library of the House.