HC Deb 09 January 2002 vol 377 cc880-1W
Norman Baker

To ask the Chairman of the Accommodation and Works Committee on how many days since Portcullis House opened the water feature has been(a) operational and (b) out of operation. [25383]

Derek Conway

A leak developed last summer after the water feature had operated successfully for some 12 months. This has resulted in the water feature being switched off for most of the time since the summer recess. Following protracted discussions a way to resolve the problem has now been agreed with the company that has taken over the responsibilities of the original contractor, who is no longer in business. This will lead to the leak being repaired at the least possible cost to the House.