§
Jacqui Smith
[pursuant to her reply, 12 February 2001, c. 46W]: The project-specific allocations to individual schools in the South Derbyshire constituency in each financial year from 1993–94 are shown in the tables.
9W
1995–96 |
School name |
Project description |
Allocation (£) |
Belmont Primary |
New Classroom Block and toilets |
36,000 |
Linton Primary |
Boiler replacement |
8,440 |
Shelton Junior |
Developing independent learning through IT |
30,000 |
Chellaston Junior |
ICT |
117,500 |
Merrill College |
Boiler replacement |
6,417 |
|
IT equipment |
117,500 |
|
Repairs to drains |
4,345 |
John Port |
Disabled access |
954 |
|
Repair/replace water installation |
26,675 |
|
Replacement of obsolete thermostatic mixing valves |
2,500 |
|
Re-roofing works |
63,447 |
1996–97 |
School name |
Project description |
Allocation (£) |
Chellaston Junior |
Six classroom extension |
536,618 |
Shelton Junior |
Asbestos removal |
82,002 |
Pennine Way Junior |
Detached three classroom block with covered way |
196,496 |
Merrill College |
Health and safety work |
64,208 |
|
Mechanical extract ventilation and refurbishment |
142,000 |
|
Demolition and reprovision of toilets |
54,000 |
|
Replacement of failed boiler |
9,038 |
John Port |
New technology provision |
450,769 |
|
Health and safety work |
49,845 |
|
Boiler replacement in Ashbourne block |
76,059 |
|
Ventilation and electrical works |
359,372 |
|
Replacement of hot water cylinder |
8,540 |
|
Repairs to Ashbourne block |
39,996 |
Noel-Baker |
Replacement of heating system |
138,240 |
|
Refurbishment of toilets and drainage repairs |
42,587 |
The Pingle |
Provision of additional places |
265,888 |
|
Repairs to external fabric |
125,304 |
|
Provision of additional places |
165,304 |
1997–98 |
School name |
Project description |
Allocation (£) |
Repton Primary |
Provision of nursery places |
50,000 |
Chellaston Secondary |
Sports Hall |
178,953 |
Merrill College |
Rewire gym and replace lower school water tank |
78,137 |
|
Repairs to science block heating and refurbishment of two labratories |
43,355 |
|
Reglaze and repair windows and extraction canopy in kitchen |
39,630 |
|
Repair defective cabling and control equipment |
2,796 |
John Port |
Re-roof home economics classrooms |
88,900 |
|
Fire compartmentation of Edale Block |
45,126 |
Noel-Baker |
Re-roofing of the science block |
114,191 |
The Pingle |
Roof repairs |
50,456 |
|
Provide ramp and handrails |
43,938 |
|
Work to masonry, cladding, windows and doors to main block |
129,417 |
10W
11W
1998–99 |
School name |
Project description |
Allocation (£) |
Repton Primary |
Modifications to doors, toilets and access to the school |
1,000 |
|
Re-roofing works |
4,623 |
Chellaston Junior |
Ramp provision |
3,765 |
|
Glazing—addition of safety film to windows |
5,700 |
Linton Primary |
Replacement of two mobile classrooms |
100,178 |
Shelton Junior |
Introduction of Successmaker into the curriculum |
36,272 |
Pennine Way Junior |
Install ICT suite, extend and refurbish library |
20,000 |
Merrill College |
Completely rewire original building |
96,798 |
|
Gas distribution, ventilation and electrical work |
38,386 |
|
Rationalisation of school sites |
119,875 |
|
Emergency Health and Safety work |
6,071 |
John Port |
Complete replacement of failing concrete panels |
297,515 |
|
New sixth form (preliminary work) |
47,619 |
|
Refurbishment to elevation curtain wall |
46,530 |
|
Glazing |
11,633 |
|
New sixth form |
1,858,795 |
|
Re-roofing works |
38,480 |
Noel-Baker |
Repairs to gas pipes |
9,521 |
|
Re-roofing works |
47,818 |
The Pingle |
Sports hall and changing rooms |
200,000 |
|
Roof, cladding, windows and lights |
40,853 |
|
Provision of a lift |
40,788 |
1999–2000 |
School name |
Project description |
Allocation (£) |
Linton Primary |
Emergency replacement of collapsed drain |
14,868 |
Shelton Junior |
Emergency replacement of water heater |
11,490 |
Chellaston Secondary |
Increase accommodation and refurbish science facilities |
200,000 |
Merrill College |
Emergency roofing repair works |
25,979 |
|
Emergency drainage repairs |
6,004 |
Noel-Baker |
Relocation of specialist facilities |
804,925 |
The Pingle |
Two general teaching rooms and conversion of two laboratories |
144,760 |
In addition, Derbyshire local education authority was allocated central Government support for capital investment in schools between 1996–97 and 2000–01 as shown in the following table. Information before 1996–97 is not readily available.
Central Government support for Capital Investment in schools in Derbyshire local education authority |
|
£000 |
1996–97 |
5,088 |
1997–98 |
4,037 |
1998–99 |
12,708 |
1999–2000 |
13,008 |
2000–2001 |
27,128 |
Total |
61,969 |