HC Deb 09 April 2001 vol 366 cc364-6W
Mr. Key

To ask the Secretary of State for Defence (1) if he will list the(a) original in-service date, (b) current in-service date, (c) estimated or actual cost, (d) years of peak expenditure and (e) prime contractor for (i) BOWMAN, (ii) Ptarmigan, (iii) Euromux, (iv) Cyprus Fixed Telecommunications System, (v) Fixed Telecommunications System (Germany), (vi) Falkland Islands Trunk System, (vii) BRINTON, (viii) Brunhilde, (ix) Telephone Exchanges Worldwide, (x) Cyprus Fixed Telephone System, (xi) Deployable Local Area Network, (xii), ADLBS MLU & IADS Interface, (xiii) UKADGE ICCS, (xiv) UKADGE CMP, (xv) P-JFACHQ Deployable Air C2, (xvi) P-JFACHQ Receive Only Link 11 System, (xvii) P-JFACHQ Deployable Air C2 Incremental Assessment Demonstration and Manufacture, (xviii) P-JFACHQ Deployable Shelter System, (xix) P-JFACHQ Quick Win 1, (xx) P-JFACHQ Increment, (xxi) Initiative Local Data Communications Network (LDCN), (xxii) Hourglass, (xxiii) Lambeth, (xxiv) PABX Transportable JAPNMS Facility, (xxv) Tactical Air Control Centre, (xxvi) Ship-Shore-Ship Buffer Tranche 2, (xxvii) Ship-Shore-Ship Buffer Tranche, (xxviii) HF Broadcast Modernisation, (xxix) ITACC LFS, (xxx) RN HF Ship-Shore-Ship Modernisation and NATO Interoperability Programme, (xxxi) Falcon, (xxxii) Saturn, (xxxiii) Cormorant, (xxxiv) Successor Interrogator Friend or Foe, (xxxv) VHF ICAO, and (xxxvi) Defence HF System;[157519]

  1. (2) if he will list the (a) original in-service date, (b) current in-service date, (c) estimated or actual cost, (d) years of peak expenditure and (e) prime contractor for the (i) Sonar 2087, (ii) PAAMS-Principal Anti-Air Missile System, (iii) Sonar 2193, (iv) Improved Ammunition, (v) Sea Dart IR Fuze, (vi) Seawolf MLU, (vii) T967M Interference Mod, (viii) Seawolf CA/CD, (ix) T911 Interference Mod, (x) Seawolf VL CACD Read ACross; Radar T996, (xi) Radar T996 AVIMP, (xii) LFE; LFB, (xiii) LFC, (xiv) Seawolf Enhanced Low Level Fuze, known as the Seawolf Mk 4 Fuze, (xv) Remote Influence Minesweeping System, (xvi) DLH; Seawolf Telemetry Kits, (xvii) Seawolf PADT, (xviii) Gun System Automatic 8 & General purpose Electro Optical Director, (xix) T23 Frigate Command System, (xx) Tomahawk Land Attack Missile, (xxi) Seawolf Block 2, (xxii) Harpoon, (xxiii) Harpoon Mod and (xxiv) SWELL Mk 4 Fuze;[157494]
  2. (3) if he will list the (a) original in-service date, (b) current in-service date, (c) estimated or actual cost, (d) years of peak expenditure and (e) prime contractor for the (i) Eurofighter, (ii) Merlin HC Mk 3, (iii) Hercules Rolling Replacement Tranche 1-C-130J, (iv) Future Carrier Borne Aircraft, (v) Future Offensive Air System, (vi) Future Strategic Tanker Aircraft, (vii) Future Organic Airborne Early Warning system, (viii) Support Amphibious battlefield Rotorcraft, (ix) Nimrod Maritime Reconnaissance and Attack Aircraft Mk 4, (x) Merline HM Mk 1, (xi) Attack Helicopter Crew and Special-To-Arm Collective Training, (xii) Watchman Middle Wallop, (xiii) Watchman Wattisham, (xiv) Attack Helicoper and (xv) Sea King Airborne Early Warning Mission System Upgrade (MSU)-Sea King AEW Mk 7; [157490]
  3. (4) if he will list the (a) original in-service date, (b) current in-service date, (c) estimated or actual cost,(d) years of peak expenditure and (e) prime contractor for (i) Guided Multiple Launched Rocket System, (ii) Next Generation Light Anti-Armour Weapon, (iii) Area Defence Weapon, (iv) Light Forces Anti-Tank Guided Weapon, (v) SA80 Modifications, (vi) Aimed Controlled Effect Anti-Tank Munition, (vii) AS90 Training System, (viii) Battlegroup Thermal Imaging, (ix) Future Ground Based Air Defence, (x) Air Defence Command Information System, (xi) CHARM 3 Training Round, (xii) Integrated Ground Based Air Defence, (xiii) Extended Range Ordnance Modular Charge System, (xiv) High Velocity Missile System, (xv) MLRS Future Fire Control System, (xvi) Indirect Fire Precision Attack, (xvii) Tubed Artillery Conventional Ammunition System, (xviii) Advanced Sound Ranging Programme, (xix) Light Mobile Artillery Weapon System, (xx) Man-Portable Surveillance Target Acquisition Radar, (xxi) Mid-Life Improvement, 366W (xxii) Joint Fire Support Battlefield Information System Application, (xxiii) Counter Battery Radar, (xxiv) Automatic Pointing System, (xxv) Mobile Artillery Monitoring Battlefield Radar, (xxvi) Fire Control Battlefield Information System Application, (xxvii) Future Integrated Training System, (xxviii) Field Electrical Power Supplies, (xxix) 4.5kW Genset, (xxx) Lighting Towers, (xxxi) Temporary Field Accommodation, (xxxii) Pumpsets Dewatering, (xxxiii) Filter Water Separator 2000 Litres Per Min, (xxxiv) Refrigerated ISO Container and (xxxv) Field Bulk Refuelling Equipment 680 Litres Per Min;[157586]
  4. (5) if he will list the (a) original in-service date, (b) current in-service date, (c) estimated or actual cost, (d) years of peak expenditure and (e) prime contractor for the (i) Crusader 21, (ii) Mk 5 EOD Suit, (iii) Re Mine Suit/Suit Combat EOD, (iv) CS 95 LT WT trousers, (v) CS 95 field jacket, (vi) CS 95 underwear, (vii) CS 95 glove, (viii) RN improved action working dress and (ix) RN improved foul weather clothing; [157492]
  5. (6) if he will list the (a) original in-service date, (b) current in-service date, (c) estimated or actual cost, (d) years of peak expenditure and (e) prime contractor for the (i) Advanced Short Range Air-to-Air Missile, (ii) Microwave Landing System, (iii) RAIDS, (iv) Bomb Enhancement Kits Precision Guided Bomb, (v) TIALD, (vi) Beyond Visual Range Air-To-Air Missile, (vii) Saturn Lynx Mk 8, (viii) Additional Towed Radar Decoys for Tornado F3, (ix) Active Search Sonobuoy System, (x) Ship Helicopter Operating Limits Instrumentation System, (xi) Airborne Stand-Off Radar (ASTOR), (xii) SMGS, (xiii) Conventionally Armed Stand-Off Missile, (xiv) Aircrew Synthetic Training Aids and (xv) Directional Infra-Red Countermeasures;[157491]
  6. (7) if he will list the (a) original in-service date, (b) current in-service date, (c) estimated or actual cost, (d) years of peak expenditure and (e) prime contractor for the (i) Joint Tactical Information Distribution System for Sea Harrier FA2 and Sea King AEW Mk 7, (ii) RN Joint Tactical Information Distribution System, (iii) Satellite Tactical Data Link NATO Improve Link Eleven and (iv) Modular Field Catering System; [157493]
  7. (8) if he will list the (a) original in-service date, (b) current in-service date, (c) estimated or actual cost, (d) years of peak expenditure and (e) prime contractor for the (i) Roll-On Roll-Off Strategic Sealift, (ii) Future Attack Submarine, (iii) Future Surface Combatant, (iv) Type 45 Anti-Air Warfare Destroyer, (v) Alternative Landing Ships Logistic, (vi) Primary Casualty Receiving Ship, (vii) Future Naval Nuclear Fuel, (viii) Type 23 Frigates, (ix) Hydrographic and Oceanographic Survey Vessels and (x) T23 Helicopter Deck Handling Equipment (PRISM).[157495]

Dr. Moonie

The majority of the information requested is not held centrally and it could be provided only at disproportionate cost. I have already undertaken to provide the hon. Member with information on a number of the projects listed.