HC Deb 07 November 2000 vol 356 c134W
Ms Osborne

To ask the Secretary of State for the Environment, Transport and the Regions if he will make a statement on the Scottish Air Traffic Control Centre. [136423]

Mr. Mullin

The New Scottish Centre project is proceeding smoothly. Award of the detail building design contract was made to Gibb Developments on 2 November. The main construction contract will be awarded early next year. Planning applications for site preparation works will be submitted to the local authority soon and initial site preparations are expected to begin early next year. In addition, local surveys on transport, land drainage, topography and soil characteristics have been completed. NATS have already signed an agreement with Lockheed Martin for provision of much of the centre software. NATS have now informed us that the revised forecast date on which the centre will come into operation may now be in the winter of 2007–08 rather than 2006–07. This is because NATS is considering the incorporation of additional software into the centre's systems. It is only because NATS are confident that the existing centre will be able to cope until this later date that they have the option of putting back the forecast operational date to allow the incorporation of these new functions.

Forward to