HC Deb 22 October 1998 vol 317 c1188W
Mr. Trend

To ask the Chairman of the Accommodation and Works Committee what was the nature of the work carried out on the Lower Ground Floor Secretaries' Room which necessitated the removal of personnel and equipment to temporary accommodation from 4 August to 1 September; on what date the work commenced; and for how many days the room was required to be unoccupied. [55391]

Sir Sydney Chapman

An Automatic Fire Detection system was installed in the Lower Ground Floor Secretaries' area. The decanting process commenced on the 4 August with re-occupation on 1 September. The conditions of the contract give the contractor possession of the site from 4 August for 27 days and work started on 8 August.