HC Deb 26 February 1997 vol 291 c272W
Mr. Corbyn

To ask the Secretary of State for Transport (1) what is the total planned investment in track renewal, bridge repairs and station refurbishment on the Barking to Gospel Oak branch of the North London line; [15997]

(2) what reports he has received on the condition of bridges on the Barking to Gospel Oak branch of the North London line; and if he will make a statement. [15998]

Mr. Watts

[holding answer 14 February 1997]: These are operational matters for Railtrack. However, Railtrack has confirmed that the bridge over the River Lea at South Tottenham was closed for safety-related repair work during the period 7 to 10 February. Further information can be obtained from Railtrack.