§ Mr. Frank FieldTo ask the Secretary of State for Transport, pursuant to his answer of 10 June,Official Report, columns 28–29, if he will place in the Library a copy of a map showing the locations of all sections of motorway in England that have overhead lighting. [33084]
§ Mr. WattsI have asked the chief executive of the Highways Agency to write to the hon. Member.
Letter from Lawrie Haynes to Mr. Frank Field, dated 18 June 1996:
The Secretary of State for Transport has asked me to write to you in reply to your recent Parliamentary Question about a map of motorway lighting in England.
Punctuality—former Network SouthEast Lines Percentage of trains more than five minutes late in peak times Four week periods 1995/96 Operating company/group 1 2 3 4 5 6 7 8 9 10 11 12 13 1995/96 Chiltern Trains 4.0 5.6 5.8 10.1 5.0 6.1 4.6 5.7 7.1 4.8 5.8 7.8 3.8 5.9 Great Eastern 6.3 9.1 14.1 12.3 3.2 6.8 8.2 5.5 19.6 24.4 15.9 14.8 4.9 11.8 LTS Rail 6.3 3.6 7.3 8.8 18.7 16.6 13.9 11.2 11.1 13.8 9.4 9.8 7.8 12.0 Network South Central South London Lines 6.3 9.2 8.9 10.8 14.5 5.0 9.8 9.8 23.6 15.1 8.7 8.5 6.9 10.4 Sussex Coast 13.6 12.8 16.4 17.2 27.2 15.8 16.4 16.2 38.0 18.9 12.8 15.5 10.2 17.6 North London Railways Northampton Lines 17.0 13.8 7.7 13.3 9.7 7.1 7.5 9.8 13.3 18.3 13.5 27.7 20.9 13.3 North London Orbital 17.7 23.2 14.0 22.7 14.1 10.2 13.8 13.1 9.1 14.6 7.6 12.3 8.6 13.3 Watford Locals 3.3 7.1 5.8 8.8 3.8 8.7 4.2 8.0 18.4 14.7 10.9 16.7 16.2 9.6 South East Trains Kent Coast 8.2 10.6 11.0 14.3 16.6 8.6 11.6 14.2 40.9 24.4 20.7 19.7 13.1 16.4 Kent Link 5.0 6.4 7.2 10.3 11.9 9.2 10.5 12.7 33.7 22.4 21.0 19.9 12.9 13.9 South West Trains Main Line 14.6 8.4 11.1 21.8 14.4 11.6 9.3 14.5 28.7 14.6 10.3 17.0 6.3 14.0 Suburban 7.8 6.7 7.4 16.6 12.0 7.2 5.6 10.1 12.2 11.9 5.9 11.8 4.4 9.9 Thames 6.0 6.7 6.1 13.4 4.4 5.0 7.4 6.2 12.1 8.0 6.7 7.6 5.5 7.3 Thameslink 6.1 11.7 12.6 12.8 14.6 14.0 9.0 11.8 23.1 18.1 16.7 13.9 18.1 13.9 West Anglia Great Northern Great Northern 6.0 5.7 7.5 12.9 9.1 10.9 8.3 11.6 19.9 18.9 13.3 20.7 10.9 11.9 West Anglia 4.9 4.1 5.7 4.4 5.3 7.1 5.3 6.2 12.4 10.0 6.1 9.1 3.5 6.5 420W
Punctuality—former Network SouthEast Lines Number of trains more than five minutes late in peak times Four week periods 1995–96 Operating company/group 1 2 3 4 5 6 7 8 9 10 11 12 13 1995–96 Chiltern Trains 37 55 56 91 50 59 47 61 76 40 62 79 41 754 Great Eastern 160 242 340 308 366 180 223 154 541 544 441 399 137 4,035 LTS Rail 219 213 114 130 294 253 227 190 188 160 160 157 133 2,438 Network South Central South London Lines 215 326 322 370 538 182 370 377 814 404 333 324 266 4,841 Sussex Coast 178 177 226 224 387 217 227 229 474 186 180 220 145 3,070 North London Railways Northampton Lines 163 142 84 136 112 68 86 112 137 143 155 250 176 1,764 North London Orbital 741 1,010 663 825 583 470 675 735 536 671 469 501 516 8,395 Watford Locals 21 48 37 52 25 55 28 51 120 73 73 110 87 780 A copy of the Highways Agency Motorway Lighting Map is being forwarded to the Library and a copy is also enclosed for your information.