HC Deb 10 December 1996 vol 287 c104W
Mr. Denham

To ask the Secretary of State for Transport what has been the total expenditure in design, legal costs, land acquisition and other preparatory work for the M27, junctions 4 to 11, widening scheme. [8033]

Mr. Watts

A preliminary widening study of M27, junctions 4 to 12, was undertaken by consultants between 1989 and 1991 at a cost of £291,000. No other costs were incurred on the scheme until its recent withdrawal from the programme.