HC Deb 24 October 1994 vol 248 c398W
Mr. Kenneth Baker

To ask the Secretary of State for Transport how many cubic metres of soil are being removed to make the cutting for the M3 at Twyford Down; and how much would need to be removed if an additional runway were to be constructed at Gatwick as suggested by the RUCATSE working group.

Mr. Norris

I understand that some 1.8 million cubic metres of soil were removed to make the cutting for the M3 at Twyford Down. The RUCATSE working group estimated that, at Gatwick, some 18 million cubic metres of soil would need to be removed in constructing the northern runway option that was subject to detailed study.

Mr. Kenneth Baker

To ask the Secretary of State for Transport whether he has undertaken the further study, referred to in the report of the RUCATSE working group, into the possibility that the construction of a runway at Gatwick in a deep cutting would create turbulence.

Mr. Norris

No.