HC Deb 07 March 1994 vol 239 cc75-7W
Mr. William Ross

To ask the Secretary of State for Northern Ireland if he will list by start date the major road building and road improvement schemes in each roads division in Northern Ireland in the current year and for the next five years, indicating his estimate of the cost.

Mr. Tim Smith

The information is as follows:

1. Major works schemes: 1993–94
Start Date Estimated cost (£ million)
Ballemena Division September
Killead By-Pass 1993 0.9
January
B58 New Line 1994 0.9
Coleraine Division September
Greenmount Link: Stage 3 and 4 1993 0.4
Start Date Estimated cost (£ million)
Craigavon Division November
Newry By-Pass: Stage 2 1993 4.4
Newry By-Pass: Stage 3 Bridge March 1994 2.1
2. Major works 5 year programme 1994–99
Ballymena Division
Northern Distributor Ballymena 1996–97 2.2
A26 Antrim-Ballymena: Stage 2 1996–97 2.7
A2 Silverstream/Ravenhill, Canifergus 1997.98 2–8
A8 Belfast-Lame Road Dualling: Stage 1 1997–98 2.5
Belfast Division
Forster Green Belfast 1995–96 1.6
Purdysburn Road, Belfast: Stage 1 1995–96 0.8
Ballymaconaghy Road, Belfast: Stage 2 1996–97 0.6
Balmoral Avenue/Malone Road, Belfast 1996–97 0.4
Purdysburn Road, Belfast: Stage 2 1997–98 1.6
Belfast Inner Ring Road (Southern Section) 1997–98 3.0
A2 Shore Road, Belfast: Stage 4 1997–98 0.9
Year in which work is due to start Total estimated cost (£ m)
Coleraine division
Strand Road, Londonderry: Stage 2 1997–98 1.5
A2 Limavady By-pass: Stage 1 1997–98 3.0
Craigavon division
Newry By-pass: Stage 3 (Roadworks) 1994–95 5.5
Downpatrick division
Church Street/Scotch Street, Downpatrick 1995–96 1.7
Balloo Road, Bangor: Stage 3 1996–97 0.7
Comber By-pass: Stage 2 1997–98 2.9
Omagh division
Omagh Through-pass: Stage 2A (Bridge) 1994–95 0.4
A5 Burndennett 1994–95 1.3
A5 Magheramason 1994–95 0.6
Omagh Through-pass: Stage 2B 1995–96 3.2
Anne Street/Thomas Bridge, Dungannon 1996–97 0.8
A29 Carland Bridge, Dungannon 1996–97 2.2
A5 Leckpatrick 1996–97 0.8
A5 Garvaghy 1997–98 0.4

The implementation of those schemes is subject to the continued availability of finance and the completion of the statutory processes.

Mr. William Ross

To ask the Secretary of State for Northern Ireland if he will list the road bridges which are to be improved and the bridge strengthening and replacement programme, giving the start dates and costs.

Mr. Tim Smith

An annual programme of work is developed on the basis of the continuing assessment of bridges. The current programme for the 1994–95 financial year is:

Location by Roads Service Division Estimated Cost (£000's)
Ballymena
Downshire Bridge, Carrickfergus 790
Widdel Bridge 35
Mills Engines Bridge 85
Location by Roads Service Division Estimated Cost (£000's)
Gallwilly Bridge 55
Belfast
Ballyregan Water Culvert 54
Millvale Flyover 72
Jordanstown Railway Bridge 235
Monkstown Halt Bridge 185
Irish Hill Road Bridge 13
Castle Road Culvert 13
Tillysburn Subway B 13
Tillysburn Subway A 20
Victoria Park Subway
Ballylinney Burn Bridge
Connswater River Bridge 2,020
Summerhill Road Bridge 17
Ballygomartin Bridge/Forth River 81
Whitehouse Park Bridge 103
Windsor Park Footbridge 104
Loop River Culvert 60
Coleraine
Swanns Bridge 1,450
Mullarts Bridge 20
Coshquin Bridge 20
Cahery Bridge 15
Park Bridge 20
Big Drain Bridge 30
Ballyrathan Bridge 10
North Ballinteer Bridge 40
Owenbeg Bridge 15
Macosquin 20
Faughanvale Bridge 8
Milltown Bridge 12
Dunderg Bridges 15
Two Bridges Bridge 25
Mettican Bridge 25
Gelvin Bridge 270
Kilrea Bann Bridge 40
Craigavon
Aghagallon Bridge 22
Drumatine Bridge 15
Coolsallagh Bridge 26
Drumgaw Bridge 20
Connolly's Bridge 10
Clay Road Retaining Wall 20
Chapel Road Retaining Wall 13
Bridges Nos. 27, 29, 140, 1198 and 1398 172
Bridges Nos. 51, 73, 83, 316 and 2020 290
Downpatrick
Tullybrannigan Road Bridge, N'castle 120
Ballyskeagh Bridge 845
Dunmurry Lane (M1) Bridge
Glenavy Bridge 220
Omagh
Burndennett Bridge 450
Minnowburns Bridge 180
Cordromedy Bridge 65
Ardtrea Bridge 250
Bridge No. 742 80
Bridge No. 1432 40
Green Bridge 30
Carrs Bridge 65
Pollenroe Bridge 30