HC Deb 31 January 1992 vol 202 c727W
Mr. Cohen

To ask the Secretary of State for Defence what was the mean tide level calculated for the Gareloch prior to construction of the shiplift facility CSB Faslane.

Mr. Archie Hamilton

The mean tide level of the Gareloch prior to the construction of the shiplift facility at CSB Faslane was +0.28 m above ordnance datum (OD).